Обзор Проекта
Value engineering conversion of a steel-framed warehouse design to optimised precast concrete, delivering faster construction, better fire rating, and reduced overall cost.
Объём Работ
Value Engineering
Precast Product Optimisation
Connection Design
BIM for Fabrication
Детали Проекта
Клиент
Местоположение, Switzerland
Год2024
Площадь7 727 m²
НаправлениеСборный ЖБ
Тип ЗданияЛогистика
Предоставленные Услуги
Value EngineeringPrecast Product OptimisationConnection DesignBIM for Fabrication
Вызовы
1
Original steel design exceeded client budget by 15%
2
Required 2-hour fire rating without additional protection
3
Limited crane capacity on congested urban site
4
Tight delivery window for operational deadline
Наши Решения
1
Redesigned as hybrid precast system with optimised TT slabs
2
Developed custom connection details for rapid erection
3
Created element breakdown to suit site crane limitations
4
Implemented BIM-to-fabrication workflow for shop drawings
Измеримые Результаты
8%
Cost Savings
-6 weeks
Construction Time
R120
Fire Rating
100%
Element Production
“The value engineering study proved that precast was not only more economical but faster to build. BASK understood our production capabilities and designed accordingly.”
Giuseppe M.
Technical Director